Atherton Leisure Centre
The £14.7m redevelopment project at Atherton Leisure Centre in Stratford, London.
The old building has been replaced by a progressive structure used to house two community swimming pools, as well as a gym, fitness studios, play area and a café.
The new structure has a focus on sustainability, with the building featuring an eco-friendly system used to convert waste heat into electricity. As well as this the roof of the leisure centre will form a living surface covered in recycled soil to encourage plants to grow.
Project Information
Client Mulalley
Project Value £1,100,000
Contract Period 11 Months
Sector Leisure
Work Undertaken
• LV sub mains
• External Lighting
• All mains cabling
• ELV containment
• Luminaires
• Emergency Lighting
• Radio and TV distribution system
• CCTV
• Security Alarm Equipment
• Fire Alarm System
• Music and PA System
• Flood Warning Alarms
• Disabled Refuge System