DES Group UK Ltd
Visit us at DES Energy 01253 881 220
DES provided £205 M&E VE saving
Included Sslar PV and wind renewable installation
DES provided BIM learning experiences for the students

STEM Centre, Preston College

The new Science, Technology, Engineering and Maths (STEM) development was completed by Kier with DES designing and installing the M&E. Preston College, working with industry, put together an ambitious plan – which will see all the science and technology sectors brought together under one roof at the St Vincent’s Road campus.

DES generated £200k M&E cost savings through re-design, helping the client achieve their budget target. DES was brought in as part of the early design team twelve months before construction commenced.

  • 1 / 5

  • 2 / 5

  • 3 / 5

  • 4 / 5

  • 5 / 5

Project Information

Client Kier Construction

Project Value £1,900,000

Contract Period 8 Months

Sector Education

Work Undertaken
  • Full M&E Design through to Stage F
  • Main LV distribution / Sub mains
  • Small power installation including FF&E and workshop
  • General lighting and control
  • External lighting
  • Fire Alarm installation
  • PV array & Wind turbine
  • Data – structured cabling
  • External lighting
  • Mechanical ventilation
  • Air conditioning installation
  • Specialist welding extract system
  • BMS Automatic controls installation
Back to top