DES Group UK Ltd
Visit us at DES Energy 01253 881 220
Refurbishment works to multiple areas including west and dry facilities
A complex refurbishment project within fast-track, live environment
Project was completed on time and on budget

Tottenham Green Leisure Centre

The £8m redevelopment project at the Tottenham Green, North London was delivered by Integral Build. DES delivered the electrical installation package.

The changes to the development include a modern fitness suite with state of the art equipment, four new studios including a dedicated indoor cycle studio, three pools, a multi storey soft play area, a café, luxurious spa and changing facilities and a redeveloped sports hall and squash courts. The transformation also involved demolishing and rebuilding the centre’s wet changing facilities and the full refurbishment of all other areas including the health suites and training pool.

These facilities have enabled the leisure centre to offer a variety of energetic and relaxing sessions and courses for people of all ages and abilities.

  • 1 / 3

  • 2 / 3

  • 3 / 3

Project Information

Client Integral

Project Value £1,300,000

Contract Period 12 Months

Sector Fit-Out & RefurbishmentLeisure

Work Undertaken
• Strip out
• Power distribution
• General and emergency
• Specialist pool lighting (Including underwater)
• Telecommunications and Data Systems
• State of the art public access
• PAVA Fire alarms
• Fire detection systems
• Security systems CCTV including access control